OCP-209

From ΔV: Wiki
Revision as of 10:50, 8 March 2023 by Cirdec (talk | contribs) (OCP-209)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
OCP-209
Make Obonto Microengineering
High-Stress 2
Low-Stress 2
Crew 8
Dry mass 184,500 kg
Cargo bay 610 m^3
Processed cargo 50,000 kg (combined)
Hull Length 84.7 m
Hull Width 31.2 m
Min. Cargo Bay Width 24.1 m

The Obonto Construction Platform 209 is a construction craft designed for habitat construction. Obonto recently decommissioned a number of these craft, making them available on the used market. The 209 features a massive, rotating cargo bay.


Equipment

The OCP-209 can fit the largest harvester and industrial drone supplies, but can not carry any cargo containers and is limited to a small processed cargo hold of only 50,000 combined kg.